Planning Your New Pool - The Guidelines
As you plan your new pool, here are some essential guidelines to help you get started.

Standard Site Guidelines:
- Pool waterline should be at least 1000mm from property boundaries (subject to certifier or council approval).
- Pool waterline should be at least 1.5 metres from any existing structures, anything less may require an engineer’s report.
- Pools raised more than 300mm typically require a retaining wall or drop edge beam (excluding above-ground pools).
- Minimum 800mm - 1m metre wide access is needed for machinery to enter the site.

Other Considerations:
- Overhead power lines may impact crane placement, but solutions are available, it may just involve extra planning.
- Narrow or sloped access can affect what machinery can be used, and may impact cost.
- Flood zones, bushfire zones, or low landscaping ratios may require a DA (Development Application).
- Check for sewer or stormwater easements using Sydney Water’s Tap-In tool.


We're here to guide you through the process and take care of what’s required along the way.
Need help or have questions? Just reach out to our team.
1300 112 488
@sydneypoolscapes